SINOTRACK
SinoTrack 4G GPS Tracker for Vehicles, ST-901L LTE Mini GPS Tracker Waterproof Locator Real-Time Location Device for Car Motorcycle Truck Taxi with No Monthly Fee Tracking System
SinoTrack 4G GPS Tracker for Vehicles, ST-901L LTE Mini GPS Tracker Waterproof Locator Real-Time Location Device for Car Motorcycle Truck Taxi with No Monthly Fee Tracking System
Regular price
$50.49 USD
Regular price
Sale price
$50.49 USD
Unit price
per
Couldn't load pickup availability
Warm Tips: 1. We’re not include SIM card, you have to buy it (Support 2G and 4G networks) and insert it into the device 2. Before you using the online platform, please must be set the APN and the IP and port for your tracker by SMS command 3. If your sim card has PIN code (the tracker can’t read SIM card), please unlock the sim card on your mobile phone 4. If you have any problems, please feel free to contact us, we will reply quickly5.GPS vehicle tracker built-in 150mAh backup battery,can use at least 1-2 hours.We recommend connect it to car's battery directly.
Description Feature: 1. Operating temperature: -20℃to 55℃ 2. Operating Humidity: 5% to 95% Non-condensing 3. LTE-FDD B1/B2/B3/B4/B5/B7/B8/B28/B66 GSM 850/900/1800/1900MHz 4. GPS Chip: SIMCOM A7670SA 5. GPS sensitively: --162Db 6. Location Accuracy: 10 meters, 2D RMS 7. Time Accuracy: 1 microsecond time synchronization of satellite time 8.Operating voltage:9-80V
Function: 1. Build-in GPS Vehicles locator 2. Support LTE-FDD B1/B2/B3/B4/B5/B7/B8/B28/B66 GSM 850/900/1800/1900MHz 3. Support track the real time address by google link 4. Built in battery 150 mAh,when the engine starts will charge,no worry outage 5. Support Geo Fence Alarm 6. Main Power Off Alarm (with built battery only) 7. Support single location 8. Support Over Speed Alarm 9. Support Low Power Alar 10. Waterproof 11. With ACC to detect ignition
Package Includes: 1× ST-901L GPS Tracker 1 x double-sided 1 x User Manual
